Pitless Weighbridge

Detail

Low civil cost and lesser excavation is required.
Very rugged and tough in structure.
Comes in module form for easy transportation and installation.
Surface mounted, hence very economical civil cost.
The load cell & consequently the top of deck plate are above the ground level,
facilitating easy maintenance.
No high water trouble and drainage problems.

 

Benefits

  • Platform above ground level - No water logging during rainy season.
  • Problem of pit maintenance is eliminated.
  • Easy maintenance since all parts accessible above ground level.
  • In Pit less weighbridge RCC ramp work must be required at lest 3 meters for both side for easy movement of vehicle.